Vienna-Penzing: Resumption of Construction Work on Deutschordenstraße
On Deutschordenstraße, a structurally separated two-way bike path approximately 315 meters long and 2.60 meters wide will be constructed on the side with even house numbers. Additionally, new benches will be installed. The intersection of Deutschordenstraße/Linzer Straße will be redesigned, and the bike path will be extended to Lorenz-Weiß-Gasse.
Traffic Measures During Construction Work on Deutschordenstraße in Vienna-Penzing
The work on Deutschordenstraße will be carried out while maintaining traffic. During the construction period, Linzer Straße from the intersection with Deutschordenstraße to and in the direction of Müller-Guttenbrunn-Straße will be operated as a temporary one-way street. Traffic in the opposite direction will be diverted from Kinkplatz via Ernst-Bergmann-Gasse and Hütteldorfer Straße to Linzer Straße. Pedestrian traffic will remain in place.
Location of the construction site: 14th district, Deutschordenstraße between Keißlergasse and Linzer Straße
Start of construction: April 15, 2025
Planned end of construction: May 4, 2025
For more information, visit here or call +43 1 955 59 - Infoline Street and Traffic.
(Red)
This article has been automatically translated, read the original article here.
Du hast einen Hinweis für uns? Oder einen Insider-Tipp, was bei dir in der Gegend gerade passiert? Dann melde dich bei uns, damit wir darüber berichten können.
Wir gehen allen Hinweisen nach, die wir erhalten. Und damit wir schon einen Vorgeschmack und einen guten Überblick bekommen, freuen wir uns über Fotos, Videos oder Texte. Einfach das Formular unten ausfüllen und schon landet dein Tipp bei uns in der Redaktion.
Alternativ kannst du uns direkt über WhatsApp kontaktieren: Zum WhatsApp Chat
Herzlichen Dank für deine Zusendung.