Start for Redevelopment at Czerninplatz in Vienna-Leopoldstadt
As part of the redesign at Czerninplatz, the recreational areas will be expanded, new seating options and additional shading elements will provide improved quality of stay alongside a new water feature and a drinking fountain.
Traffic Measures During the Redesign at Czerninplatz in Vienna-Leopoldstadt
Existing tree pits at Czerninplatz will be enlarged, and 7 new trees as well as 2 high-stem shrubs will be planted. In total, over 1,200 square meters will be unsealed through green spaces and permeable pavements. New sidewalk extensions will improve visibility and increase safety for pedestrians. Passage through Czerninplatz will remain possible during the construction work, only Fruchtgasse will be closed during this period. Stopping and parking in the construction area will not be possible throughout the entire construction period.
Location of the construction site: 2nd district, Czerninplatz
Start of construction: March 24, 2025
Planned end of construction: July 2, 2025
For more information, visit here or call +43 1 955 59 - Infoline Street and Traffic.
(Red)
This article has been automatically translated, read the original article here.
Du hast einen Hinweis für uns? Oder einen Insider-Tipp, was bei dir in der Gegend gerade passiert? Dann melde dich bei uns, damit wir darüber berichten können.
Wir gehen allen Hinweisen nach, die wir erhalten. Und damit wir schon einen Vorgeschmack und einen guten Überblick bekommen, freuen wir uns über Fotos, Videos oder Texte. Einfach das Formular unten ausfüllen und schon landet dein Tipp bei uns in der Redaktion.
Alternativ kannst du uns direkt über WhatsApp kontaktieren: Zum WhatsApp Chat
Herzlichen Dank für deine Zusendung.