Construction Site Due to Renovation of the Augarten Bridge in Vienna-Leopoldstadt

The city of Vienna will begin transforming the bike lane at the Augarten Bridge into a two-way bike path on April 14, 2025. This will be connected to the cycling facilities on Obere and Untere Donaustraße. The intersection plateau will also be adjusted. Additionally, the storage area on Obere Donaustraße in front of Untere Augartenstraße will be renewed.
Traffic Measures During the Renovation of the Augarten Bridge in Vienna-Leopoldstadt
From the start of construction until April 22, 2025, there will be a straight-ahead and a right-turn lane on Obere Donaustraße from the area in front of Untere Augartenstraße. From April 22, two lanes will be available to traffic again, a straight-ahead and a straight-ahead-right-turn lane. The crossing of the bike paths to Untere Augartenstraße and the bike path along Obere Donaustraße will be closed. Pedestrian traffic will remain maintained.
Location of the construction site: 2., intersection plateau Obere Donaustraße/Augarten Bridge/Untere Augartenstraße
Start of construction: April 14, 2025
Planned end of construction: May 31, 2025
For more information, visit here or call +43 1 955 59 - Infoline Street and Traffic.
(Red)
This article has been automatically translated, read the original article here.
Du hast einen Hinweis für uns? Oder einen Insider-Tipp, was bei dir in der Gegend gerade passiert? Dann melde dich bei uns, damit wir darüber berichten können.
Wir gehen allen Hinweisen nach, die wir erhalten. Und damit wir schon einen Vorgeschmack und einen guten Überblick bekommen, freuen wir uns über Fotos, Videos oder Texte. Einfach das Formular unten ausfüllen und schon landet dein Tipp bei uns in der Redaktion.
Alternativ kannst du uns direkt über WhatsApp kontaktieren: Zum WhatsApp Chat
Herzlichen Dank für deine Zusendung.