Vienna Southeast Tangent: Traffic Jam Due to Construction Work on the Prater Bridge Towards Kagran
This weekend, the Prater Bridge in the direction of Kagran will become a major construction site from Friday to Sunday. According to current information, only one lane will be passable at night, while during the day from 9:00 AM to 10:00 PM, two lanes will be available. Drivers should expect significant traffic jams, and delays of over two hours cannot be ruled out.
Alternatives to Bypass Traffic Jams in Vienna
To avoid traffic jams, it is advisable to choose alternative routes. The A1, the A4, as well as roads within the city area, are recommended to bypass the construction site and save time.
The positive aspect of this construction site is that, according to Asfinag, the work this weekend will be the last for this year. The A23 is heavily frequented at this point, with around 220,000 vehicles per day.
Current Status of Renovation Work
The renovation work on the Prater High Road has already been completed. However, in the open area before and after the Prater High Road, particularly in the area of the Prater junction and the Handelskai exit, one-time renovation work is still required. The continuation of the construction work is planned for the spring of next year.
(Red)
This article has been automatically translated, read the original article here.
Du hast einen Hinweis für uns? Oder einen Insider-Tipp, was bei dir in der Gegend gerade passiert? Dann melde dich bei uns, damit wir darüber berichten können.
Wir gehen allen Hinweisen nach, die wir erhalten. Und damit wir schon einen Vorgeschmack und einen guten Überblick bekommen, freuen wir uns über Fotos, Videos oder Texte. Einfach das Formular unten ausfüllen und schon landet dein Tipp bei uns in der Redaktion.
Alternativ kannst du uns direkt über WhatsApp kontaktieren: Zum WhatsApp Chat
Herzlichen Dank für deine Zusendung.